Road work in District # 2

    

 

·       Farmer’s Market Road, 35 to Talala Overlay Complete 2005

·       98th , 99th , & 100th St.No., 1mile Owasso Overlay  

                                                                             Complete 2005

·       ¾ mi. Road between Trails End & Viewpoint Estates Overlay

                                                                                 Complete 2005

·       Rolling Meadows Addition 5 miles Overlay  Complete 2006

·       Coyote Corner Rd. 412 between 34 & 35 1 mile,  Chipseal

                                                                             Complete 2005

·       409,34.5 to 31, then west 4 miles, 7.5 miles total Chipseal

                                                                                 Complete 2005

·       31 Rd. between 411 & 413, 2 mi. Chipseal   Complete  2005

·       Rattlesnake Ranch 1 mi.,Rd.413 2 miles Chipseal

                                                                             Complete 2006

·       Quail Creek, Claremore 2 miles Chipseal      Complete 2006

·       Rd. 408 & Vera Rd. to EW36, 3mi.Chipseal Complete 2006

·       Lipe Ranch Road, 1 ½ miles Chipseal           Complete 2006

·       Open Range Road-EW 45.5 to NS 411, 2 miles Chipseal

                                                                                 Complete 2006

·       Back parking lot of Oologah Schools               Complete  2007

·       N/S 408 road from Farmers Market road         Complete 7/30/8

·       N/S 411 from E/W 33 behind Talala                Complete 9/12/7

·       E/W 370 New Bridge & Overlay                      Complete 1/14/8

·       N/S 4090 from E/W 390 to E/W410 Overlay  Complete 1/11/8

·       Cedar Bluff addition Overlay                            Complete 1/15/8

·       Ranch Acres & Scissortails addition overlay    Complete 1/07/8

·       E/W 390 west to N/S 4060 4miles Overlay     Complete 1/20/8

·       Ridge Road port of Catoosa Overlay                Complete 2/10/8

·       Port Road behind Port Deli to the church and out to the highway, Overlay                                           Complete 2/11/8

·       Corner Stone IV Overlay                               Complete 2/10/8

·       Road 35 West off of U.S. 169 (Dead End), road was zipped in the fall of 2007, new culverts were installed at this time, 2000 gallons of AEP tack oil was put down on 7-29-08 by Curtis Barnes @ a slot rate of .17.  On 7-30-08, road was double chip and sealed with ¾” and ½” chips using CRS-2 oil for both layers, .45 and .30.  On 8-5-08, micropave mat was laid with CRS-2 oil @ .30 slot rate.  On 8-6-08, double chip and sealed with ¾” and ½” chips, CRS-2 oil .45 and .30 slot rate                                                   to be completed 2008

 

                       

                        Roads that will be chip sealed in 2008:

 

·       Road 411 from 33 around behind Talala Cemetery

·       Road 408 from 32 to 33

·       Road work on 413 south of 35, will begin in late summer 08

·       View Point Road will be hard surfaced at a later date

 

 

Rogers County District 2 Planned Projects:

 

 

·       2009 State Transportation Project Elm Creek Bridge (under design), construction cost $609,000  Completion within 1 yr.

·       2012 State Transportation Project 46th to 66th St. North at 193rd E. Ave., construction cost $2,000,000

·       Realignment on Keetonville Road (2 bridges), construction cost $2,500,000

·       EW38 Rabb Creek Bridge (underway), construction cost $200,000

·       2013 4-lane Pine St. to 289th or Johnson Port 33, construction cost $8,400,000

·       Onion Creek Bridge, construction cost $600,000

·       Talala Creek Bridge, construction cost $600,000

·       Four Mile Creek Bridge, construction cost $600,000

·       Talala Overlay (6 miles), construction cost $360,000

·       2013 76th St. North from 145th to 193rd, construction cost $5,500,000

·       Pine & 161st intersection (under design), construction cost $1,900,000

·       Corridor I-44 to Tiger Switch Road (DMI), construction cost $1,800,000

 

 

Sub-divisions to be completed in September, 2008:

 

·       Ranch Acres in Oologah

·       Horseshoe Bend in Oologah

·       Eagle Crest in Oologah

·       Cooper Ranch Estates

·       Falcon Ridge Estates